Oman Expects More Than $400 Million in Initial Investment to Assess Block 20 Gas
Key Facts
Oman signed a concession agreement on November 19 with Taqa Oman and ExxonMobil to assess and develop natural gas resources discovered in the Greater Makarem area, within Block 20. The Ministry of Energy and Minerals said the agreement begins a reservoir assessment phase, with expected initial investment exceeding $400 million. The agreement is a strategic step, according to Minister Salim Al Aufi, to strengthen energy security, develop gas reserves and increase production capacity. It sets a framework for studying the resource before determining the scope of its development, and does not mean production is starting or that a final decision has been made to build an LNG facility. The proposed project in Duqm is tied to the results of technical work that will determine potential production volumes and processing and liquefaction requirements.
Expected investment in the development and production phases exceeds several billion dollars, according to the Times of Oman, citing the Oman News Agency. This figure differs from the initial investment allocated to the current phase, which exceeds $400 million, as any move to subsequent spending depends on the assessment results. The phase includes technical studies and appraisal well drilling to determine the reservoir’s production ceiling. The results will provide a basis for setting target production volumes and infrastructure needs for development and processing. The larger investment therefore remains contingent on estimates of the resource and the technical options that emerge after the assessment is completed.
The proposed LNG facilities in the Special Economic Zone at Duqm target annual production capacity of between 6 and 9 million tons. The targeted capacity could be raised depending on technical studies and field assessment, according to the Times of Oman, citing the Oman News Agency. This ties the project’s scope to what appraisal wells reveal about the reservoir’s production capacity, rather than to a production figure fixed when the agreement was signed. Estimates of the infrastructure needed for processing, liquefaction and exports are also tied to the volume of resources that can be developed. The project sets out a vision for an integrated chain starting with gas development, but its dimensions will be determined after the technical assessment is completed.
The agreement was signed for Oman by Energy and Minerals Minister Salim bin Nasser Al Aufi, for Taqa Oman by Chief Executive Mazin bin Rashid Al Lamki, and for ExxonMobil by Dan Ammann, the company’s president of upstream. The agreement thus brings together the government, the Omani company and the U.S. energy company in the Greater Makarem concession. Al Aufi said the agreement represents a strategic step in Oman’s efforts to strengthen energy security, develop natural gas reserves and increase production capacity. These priorities put development of the local resource at the center of the project, alongside the goal of diversifying income sources cited by the minister. Published information did not specify when production would begin or when a final investment decision on the Duqm facilities would be made.
The agreement comes as Oman’s total domestic production and imports of natural gas reached 45,308.7 million cubic meters through the end of September 2026, up 6.3% from 42,617.3 million cubic meters in the same period of 2025, according to the National Centre for Statistics and Information. This growth places the new project in the context of rising domestic and imported supplies during the first nine months of the year. The project is expected to open the way for additional investment in gas infrastructure, processing, liquefaction and exports, as well as to stimulate related industrial and service activities in Duqm. It is also expected to create opportunities for Omani companies in the energy sector’s supply chains and services, strengthen local content and help develop national skills. The next step is to conduct technical studies and drill appraisal wells to determine the reservoir’s capacity and development needs.