Boeing Confirms PAL Order for 15 Dreamliners, With Option for Five More
Key Facts
Boeing confirmed Philippine Airlines’ order for 15 787-10 Dreamliners, with rights to buy five more, the company said in an announcement on November 15, 2026. PAL had selected GE Aerospace’s GEnx-1B engines to power the 15 aircraft, according to a GE announcement in July. The order is the largest widebody aircraft purchase in the airline’s history, Boeing said. Reuters reported that deliveries are scheduled to begin in 2031, meaning the aircraft will not add capacity to the network immediately. The sources did not disclose a confirmed value for the aircraft or engine contracts.
The deal began with an announcement of a commitment in July, then became a firm order in November, with the option to buy five aircraft in addition to the 15 confirmed. IBA Group estimated the deal’s value at about $3.4 billion if PAL exercises its rights to buy all 20 aircraft, Reuters reported; this is a conditional estimate, not a disclosed contract value. Boeing linked the order to renewal of the airline’s fleet and its ability to serve international operations. According to the company’s specifications, the 787-10 seats between 300 and 375 passengers and has a range of 13,890 kilometers. This capacity and range offer an option for operating long-haul flights as part of the fleet plan, while the order’s operational impact will begin after the aircraft arrive.
GE and PAL have had a relationship spanning more than 50 years, and the company said the airline’s fleet includes 52 GE and CFM engines in service. These include GE90 engines for Boeing 777-300ER aircraft and CFM56-5B engines for Airbus A320 aircraft, according to GE’s announcement. Selecting the GEnx-1B for the new aircraft extends this relationship in the widebody category. GE said the GEnx engine has a dispatch reliability rate of 99.98% and an on-wing rate three times higher than competing engines. The company provided these figures in its announcement of the engine selection, without disclosing a value for the engine contract.
The aircraft is built with a composite design that Boeing says cuts fuel consumption by 25% compared with the aircraft it typically replaces. This stated performance links fleet renewal with lower fuel consumption per flight compared with the usual replacement aircraft, according to Boeing’s benchmark. The model’s range and capacity also give the airline flexibility to operate long-haul flights, without implying added capacity before the aircraft are delivered. PAL said it operates direct flights from its hubs in Manila and Cebu to 29 destinations in the Philippines and 40 destinations in Asia, North America, Australia and the Middle East. This network reach places the aircraft order in the context of serving multiple domestic and international destinations, while the expected start of deliveries remains in 2031.
The GEnx-1B engine passed the 50 million flight-hour mark in just over 14 years, according to an earlier GE announcement. The company said the engine serves more than 50 operators worldwide, operational background it provided alongside PAL’s engine selection. The firm order follows the July announcement combining the purchase of 15 aircraft with rights to buy five more, while 2031 marks the expected start of deliveries. The deal therefore comprises a firm commitment and an additional option, with the aircraft to be equipped with engines PAL selected from GE. The announcements did not state a final order value or an earlier date for the aircraft to enter service.