EL7.AI
GeneralMedium•4 November 2026•
1 min read

Panamint Capital Secures $1.8B Green Loan for Texas Solar Project

Key Facts

1Panamint Capital achieved financial close on the first phase of a $1.8 billion Green Loan for the Big Rooter Power solar project.
2The 1.2 GWdc solar PV project is located at the Twin Oaks Power Station and Calvert Mine in Robertson County, Texas.

Panamint Capital achieved financial close on the first phase of a $1.8 billion Green Loan to finance the construction of the Big Rooter Power solar project. PR Newswire reported that the 1.2 GWdc project is located at the Twin Oaks Power Station and Calvert Mine in Robertson County, Texas.

The financing is intended to convert existing industrial brownfield sites into renewable energy infrastructure, marking a significant development for Texas energy. Panamint Capital is a private entity, and no public instrument price data was available on November 4, 2026, as the project represents a major capital commitment toward low-carbon energy solutions.